What we build

Education Construction

Education projects work to the school calendar. HSM builds and renovates learning spaces across Western Canada with its own electrical, mechanical and interior crews, up to $50,000,000.

Education Construction

Building around the school year

Schools, colleges and training centres run on fixed calendars. Summer, winter and spring breaks are the main windows for noisy or disruptive work, and the first day of classes does not move. That makes planning, ordering and sequencing the main job.

HSM works on new construction and on renovations up to $50,000,000. Because we self-perform most trades, we can run extra shifts and adjust the sequence quickly when a break is short.

Education clients often work with public funding and clear approval steps. We provide a single project manager, a clear schedule and plain reporting, and our calls and email are answered 24/7/365.

Safe, healthy learning spaces

Children and students need good air, good light, clean acoustics and safe surroundings. Our mechanical crew handles HVAC and plumbing, and our Master Electrician-led crew handles lighting, power and emergency systems. Our low voltage team handles alarms, AV, surveillance and sound.

Our Director of Health & Safety, Ghilda Gaber, leads site safety, including separation from occupied areas.

When HVAC, lighting, alarms and finishes are done by one company, we can complete a classroom or wing in stages and hand it back to the school sooner.

Education ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Education building types we build

Every space has its own needs. See the pages below for details.

  • Elementary schools
  • Secondary schools
  • Post-secondary facilities
  • School renovations
  • Modular classrooms
  • Science labs
  • Libraries
  • Gymnasiums
  • Training centres
  • Daycares
  • Early learning centres

What to plan for

Funding approvals, permits and long-lead equipment can all affect the start date. Alberta winters also matter for site work, deliveries and concrete, so we plan the sequence with the weather in mind.

After the build, HSM can add security systems, digital signage, computer networks, furniture and building maintenance as turn-key services.

Safety on or beside an operating school is non-negotiable. We plan fencing, deliveries and work hours with the school, and we keep a clear line of communication with administrators throughout.

Questions we hear

Can HSM work during the school year?

Often, in separated zones with dust, noise and safety controls. The noisiest work is usually saved for breaks and after hours.

Does HSM handle small education projects?

Yes, from classroom updates to larger additions, within our $50,000,000 range.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.