What school renovations often include
Typical projects include classroom updates, washroom upgrades, new flooring and lighting, accessibility improvements, HVAC replacement, security upgrades, library and gym refreshes, and wiring for technology.
Many older schools need work behind the walls too: aging pipes, outdated electrical panels and ventilation that no longer meets demand.
A good first step is a walk-through with your facilities team. We note what is failing, what is nearing the end of its life and what could be combined in one visit, so you get the most from each closure of a room or wing.
Phasing around students
The safest approach is to divide the building into zones. Each zone is closed, renovated and returned to use before the next begins. Barriers, dust control, separate entrances and quiet hours protect students and staff.
Noisy tasks such as demolition and drilling are scheduled for evenings, weekends and breaks wherever possible.
Our trades under one roof
Our Master Electrician-led crew handles power and lighting, our mechanical team handles HVAC and plumbing, and our interior systems crew, led by Brian Wright, handles framing, drywall and ceilings. Our carpenters, painters and door crews complete the rooms.
Because these trades work together, shutdowns of power or water are short and carefully planned.
Where work reaches inside walls and ceilings, our crews plan the order so rooms are not opened twice.
Safety and accessibility
Safety is the first rule on an occupied school site. Our Director of Health & Safety, Ghilda Gaber, leads planning, including controlled access, signage and daily checks.
Accessibility upgrades such as ramps, doors, washrooms and signage are often part of renovation scope and are guided by the Alberta Building Code.
Planning notes
Summer is the busiest window. Contractors, materials and permits book up, so plan early. Winter projects can also work, with careful coordination.