Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Education

Secondary School Construction

Secondary schools combine classrooms with labs, shops, gyms and performance spaces. HSM builds and renovates them with its own electrical, mechanical and carpentry crews.

Secondary School Construction

Many different rooms in one building

A high school may include classrooms, science labs, a library, trades shops, a cafeteria, gymnasiums, a theatre and music rooms. Each has different needs for ventilation, power, sound and finishes.

We plan these spaces together so that the building works as a whole, with dust, noise and fumes managed, and with clear routes for students and deliveries.

Gymnasiums, cafeterias and theatres are large rooms with big ventilation and lighting loads. Having mechanical and electrical done by one company keeps these systems coordinated with the structure and finishes.

Shops, labs and specialty rooms

Trades shops and science labs need serious ventilation, power and sometimes dust collection or fume hoods. Our mechanical crew handles exhaust, make-up air and plumbing, and our Master Electrician-led crew installs panels, disconnects and lighting.

Music and drama rooms need sound isolation and acoustic treatment, and our interior systems team builds walls and ceilings to suit.

Secondary School ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Technology and security

Students and teachers depend on networks, displays and AV. Our low voltage team installs data cabling, AV, alarms and cameras, and can supply digital signage for hallways and common areas.

Larger buildings benefit from zoned access control that lets staff lock down or open areas as needed.

Renovations in an operating school

Most secondary school work happens while classes run. Work areas are separated, deliveries are scheduled outside peak hours and dust is controlled. Noisy or disruptive tasks are saved for evenings, weekends and summer.

Our Director of Health & Safety, Ghilda Gaber, leads site safety, which includes keeping students out of work zones.

Planning notes

Plan for approvals, specialty equipment lead times and the school calendar. Cold weather affects exterior work and concrete, so we sequence around it. HSM provides one schedule and one accountable team.

Performance spaces and gyms often need specialty lighting, rigging or sports flooring with long lead times. Ordering these early keeps the summer window intact.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.