Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Education

Gymnasium Construction and Renovation

A gymnasium is a large, loud, hard-working room. HSM builds and renovates gyms with its own electrical, mechanical and carpentry crews, from floors to lighting to ventilation.

Gymnasium Construction and Renovation

Floors and walls built for impact

Sports floors take constant impact and need the right base. Moisture is a common cause of failure, so slab conditions are tested before flooring goes in. Wall padding, backing for equipment and door protection are built to last.

Our carpenters install backing for basketball hoops, wall mats and bleachers, and our finishing crews handle paint, line work coordination and trim.

In older gyms, we check the slab, subfloor and drainage before choosing a new floor. Fixing a moisture problem first is much cheaper than replacing a new floor later.

Lighting and power

Gym lighting needs even light without glare. High-bay fixtures, protective guards and controls for different uses are common. Our Master Electrician-led crew installs lighting, scoreboards, sound systems power and emergency lighting.

Our low voltage team installs the public address system, cameras and alarms.

Gymnasium Construction and RenovationPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Ventilation and heating

A gym is a big volume with many active people, so ventilation and heating matter. Our mechanical crew designs air handling that keeps air fresh and temperatures comfortable, without noisy diffusers or drafts across the court.

Change rooms, washrooms and showers need plumbing, drainage and ventilation, and our mechanical team handles them, including accessible fixtures.

Acoustics

Hard surfaces produce echo. Acoustic wall panels, ceiling treatments and baffles improve speech clarity for announcements and teaching. Our interior systems crew installs them, and we coordinate with lighting and ductwork.

The gym is also used for assemblies and community events, so sound quality counts.

Planning notes

Equipment such as bleachers, hoops and sports flooring has long lead times. Plan work for summer when possible, and allow curing and off-gassing time for floors before the room is used.

Our own crews coordinate high-bay lighting, ventilation and acoustic panels, so ceiling work happens once and in the right order.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.