Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Education

Post-Secondary Facility Construction

Colleges and universities need flexible, technology-rich spaces on tight academic calendars. HSM builds and renovates them with its own electrical, mechanical and interior crews.

Post-Secondary Facility Construction

A wide range of spaces

Post-secondary projects include lecture halls, classrooms, teaching labs, student services, offices, study areas, cafeterias and common spaces. Each has its own needs for seating, sound, ventilation and technology.

We work within the campus's standards and approval processes, which are often detailed, and we keep records and communication clear.

Many campuses have standards for finishes, hardware, controls and equipment. We review them at the start so that selections match what the facilities team already maintains, which lowers long-term upkeep.

Technology everywhere

Students and faculty expect strong wireless coverage, displays, projectors, microphones and recording. Our low voltage team, led by Adam Mason, installs data cabling, AV, sound systems, alarms and cameras. Our electricians provide power for charging and equipment.

Lecture halls need good acoustics and sightlines, and our interior systems crew builds ceilings and walls to suit.

Post-Secondary Facility ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Labs and specialty teaching

Teaching labs may involve fume hoods, special exhaust, gases, sinks and heavy equipment. Our mechanical and electrical crews handle the services, and our in-house engineering, led by Dr. Magdy Istafanous, helps review loads and airflow.

Casework, finishes and equipment should be chosen for heavy use by many students.

Working on a live campus

Campuses run nearly year-round, with summer terms and busy exam periods. We plan phasing, access, parking, deliveries and dust and noise control with the campus team, and use summer and break periods for the loudest work.

Winter conditions affect access and exterior work, so we plan temporary protection and clear paths.

Planning notes

Start with the academic calendar and work backward. Long-lead items such as lab equipment, lighting and AV should be ordered early. HSM provides a single point of contact and a clear schedule.

Student areas wear quickly. Durable flooring, wall protection and furniture reduce repairs, and our building maintenance service can help keep spaces in shape after handover.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.