The work starts before you sign a lease. Here is how a project runs with HSM, step by step, from site selection to maintaining the finished building.

- Step 01Site and LeaseStep 1 of 12. Our process starts before the lease is signed, when the choices you make have the largest effect on cost.
- Step 02Feasibility StudyStep 2 of 12. A feasibility study tests your idea against the real conditions of the site, the code and the budget.
- Step 03Concept DesignStep 3 of 12. Concept design is where your needs become a space you can see, with the cost kept in view.
- Step 04EngineeringStep 4 of 12. Engineering turns the approved concept into drawings and specifications that can be permitted and built.
- Step 05BudgetStep 5 of 12. The budget turns the engineered design into a detailed, line-by-line price you can approve.
- Step 06ScheduleStep 6 of 12. The schedule shows who does what and when, from permit to handover.
- Step 07PermitsStep 7 of 12. Permits give legal approval to build. We prepare and manage them so work can start with confidence.
- Step 08ProcurementStep 8 of 12. Procurement is where equipment is ordered and trade scopes are secured, so work begins with everything in place.
- Step 09ConstructionStep 9 of 12. Construction is where plans become a building, led by one team and mostly built by our own crews.
- Step 10CommissioningStep 10 of 12. Commissioning proves that what was installed works as designed, before you move in.
- Step 11HandoverStep 11 of 12. Handover is the point where the space becomes yours, with the paperwork and knowledge to run it.
- Step 12Operate and MaintainStep 12 of 12. Our work continues after opening, with the same trades that built your space available to look after it.