Projects

School Renovation

Renovating a school means working near children and around a fixed calendar. This project shows how we plan for both.

School Renovation
Illustrative image

Older buildings, new needs

Many schools were built decades ago. Classrooms may need better lighting, ventilation, technology and accessibility. Mechanical and electrical systems can be near the end of their life, and finishes may be worn.

We begin with a careful survey. Opening up walls and ceilings early, where possible, shows what the building holds and keeps surprises to a minimum.

Phasing and safety

Most school renovations happen in stages. Summer is the main window, but some work continues during the term. We separate work zones, build temporary barriers, control dust and noise, and plan delivery routes away from student paths.

Our site team coordinates directly with administrators and facility staff. Safety is part of the plan every day, led by our Director of Health & Safety.

School RenovationPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Work done by our own crews

Our electrical team, led by a Master Electrician, upgrades lighting, power and emergency systems. Our mechanical crew replaces or improves HVAC and plumbing, including washroom and fountain upgrades. Our low voltage group adds networks, security, intercoms and cameras.

Our interior systems crew handles framing, drywall and ceilings, and our carpenters, painters and door and hardware teams finish classrooms, corridors and offices.

  • Better lighting and ventilation
  • Accessibility improvements
  • Technology and network cabling
  • Secure entries and cameras

Planning for the calendar

The start of term is not negotiable. We order long-lead items, such as mechanical equipment and specialty doors, early, and build a schedule with float for inspections. Permits and inspections are managed as part of our work.

With one team running all major trades, we can add crews when a deadline is at risk and keep the school informed with plain updates.

Self-performing the major trades also helps with cost. When electrical, mechanical and interior work share one budget and one schedule, we can see trade-offs early and recommend the best use of limited funds, rather than discovering conflicts after pricing.

Questions we hear

Do you work in the summer break?

Yes. Summer is often the main window, and we plan procurement and crew availability well ahead of it.