Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Transportation

Airport Terminal Construction

An airport terminal never really closes. HSM plans terminal work around flights, passengers and security, using our own trades to keep disruption small.

Airport Terminal Construction

Working in a live terminal

Terminal work is carried out beside passengers, baggage and aircraft operations. Work zones need solid hoarding, dust and noise control, clear signage and safe passenger routes. Many tasks happen overnight, so crews must be ready to start and finish within short windows, leaving the area clean and open by morning.

Airports have their own access, badging, escort and equipment rules. We learn them at the start, and we plan deliveries and staging with airport operations so materials arrive when and where they can be handled.

Systems and finishes

Terminals rely on power, ventilation and communications. Our electrical crew, led by a Master Electrician, handles lighting, power to gates, concessions and kiosks, and emergency systems. Our mechanical crew installs HVAC, plumbing and ventilation, including the kitchen exhaust for food concessions. Our low voltage group, led by Adam Mason, installs networks, AV, flight information display wiring, alarms and surveillance.

Our interior crews build ceilings, walls, millwork and finishes for gate lounges, shops and public areas. Because they are all HSM crews, a ceiling opening for one trade serves the rest and avoids repeat disruption.

  • Concessions, retail and food units
  • Gate hold rooms and seating areas
  • Washrooms and family rooms
  • Power, data and information displays
Airport Terminal ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

What to plan for

Long-lead items, such as specialty lighting, signage and equipment, should be ordered early. Approval processes at airports often involve several parties, including the airport authority, tenants and regulators, so build time into the schedule.

Think about passenger experience. Clear sightlines, good lighting, accessible washrooms and quiet areas matter in a space where people spend hours. We can also support the operate phase with signage, networks and building maintenance.

Safety and security on site

Our Director of Health & Safety, Ghilda Gaber, leads site safety planning. Every worker is briefed on airport rules, restricted areas, vehicle operations and emergency procedures. Tools, materials and waste are tracked and controlled.

Expect inspections and escorts. Good planning and early badging keep them from becoming delays.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.