Recreation and sport

Arena Construction and Renovation

An arena is part ice plant, part assembly hall and part training facility. HSM builds and renovates arenas with our own electrical and mechanical crews.

Arena Construction and Renovation

What makes an arena different

Arenas combine a large, cold, open volume with warm spaces for players, officials and spectators. Moisture, condensation and air movement need careful design, or ceilings rust, ice quality suffers and energy bills climb.

Dehumidification, ventilation and radiant heating all affect the ice and the crowd, so the mechanical design has to be right from the start. Our mechanical crew installs HVAC and plumbing, and our in-house engineering team coordinates with refrigeration specialists on the ice system.

Electrical and lighting

Arena electrical loads are large. Lighting, scoreboards, sound, ice plant support and kitchen equipment all pull from the same service. Our electrical crew, led by a Master Electrician, plans and installs distribution, controls and emergency systems under one schedule.

Lighting upgrades are often the first step for older arenas. Our arena lighting page covers that work in detail.

Arena Construction and RenovationPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Renovation and phasing

Most arena projects are renovations. Dressing rooms, washrooms, concession areas, entrances and seating are often updated while the ice surface stays in service for as much of the season as possible.

We schedule noisy and dusty work around ice-in and ice-out dates, protect the ice and occupied areas, and keep safe, separate routes for the public. Alberta winter weather is part of the plan, especially for concrete, roofing and loading.

Plan for these items

Early decisions save the most money. Good questions to settle before design:

  • Which seasons can the building close, and for how long
  • Accessibility upgrades to entrances, washrooms and seating
  • Dressing room count, size and shower layout
  • Energy and heat recovery targets
  • Spectator capacity and fire separation requirements

Who you work with

Your project manager is supported by our estimators, our in-house engineers and our trade leads. Adam Williams, our Electrical Manager and a Master Electrician, leads the electrical crew. Early estimates reflect real crew costs, not rough allowances passed through a chain of subcontractors.

Questions we hear

Can you renovate an arena during the season?

Often, in phases. We plan the work around ice-in, ice-out and league schedules, and we separate work areas from public routes.