Industrial

Equipment Foundations

Heavy equipment is only as good as what it sits on. HSM prepares foundations, pads and pits that keep presses, compressors and production lines stable, level and quiet.

Equipment Foundations

Why foundations matter

A machine that vibrates, moves or settles damages itself and the building. The foundation has to carry the weight, resist dynamic loads and isolate vibration from the rest of the slab. Heavy presses, stamping equipment, generators and large compressors often need dedicated pads or isolation, not just the existing floor.

Soil conditions, frost, groundwater and nearby footings all affect design. Alberta's cold climate also means thinking about frost protection for outdoor or unheated installations.

Engineering and construction

Our in-house engineering team, led by Dr. Magdy Istafanous, reviews the equipment manufacturer's requirements and the existing slab, and coordinates with geotechnical or structural engineers where needed. The work may include saw-cutting and removing slab, excavating, forming and reinforcing, anchor bolt placement, concrete pours, grouting and curing.

Utility rough-ins are installed before the concrete goes in. Our electrical crew, led by a Master Electrician, places conduit and grounding, and our mechanical crew places drains, sleeves and piping for the equipment. Getting these in the right place the first time avoids coring through a new foundation.

  • Pads, pits and trenches
  • Anchor bolts and grouting
  • Conduit, drains and sleeves
  • Slab repair and floor finishing
Equipment FoundationsPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

What to plan for

Concrete needs time to cure before heavy equipment goes on it, and winter pours need heating and protection. Build that cure time into the schedule and confirm delivery dates for the machine so it arrives when the foundation is ready.

Dust, noise and vibration affect nearby operations, so we separate the work area and plan cutting and breaking for off-hours when possible. Keep the as-built drawings, because later changes to equipment or layouts depend on knowing what is in the ground.

Protecting the new equipment

A foundation is only the start. Levelling, alignment, grouting and final anchoring happen as the equipment is installed. We coordinate with the equipment supplier's technicians, so tolerances are met and the warranty requirements are respected.

If the machine is replacing an older unit, plan for removal as well. Old foundations and anchor bolts may need to be cut out or reused.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.