Ventilation is the main event
Labs usually need more air changes than standard clinics, along with fume hoods, biosafety cabinets and exhaust that must be balanced carefully. A poorly balanced room can be uncomfortable or unsafe.
Our mechanical crew handles HVAC and exhaust, and our in-house engineering team, led by Dr. Magdy Istafanous, reviews airflow and make-up air so rooms work as designed.
Because ventilation, plumbing and electrical are all self-performed, the coordination between fume hoods, exhaust, power and benches stays with one team and one schedule, which reduces rework.
Plumbing, gases and drainage
Labs use sinks, eyewash stations, safety showers and sometimes pure water systems, compressed air, vacuum and gas lines. Drains may need special materials or neutralization depending on what is used.
These services are specific to each lab, so we work from the lab designer and users' requirements, and coordinate with specialist suppliers for equipment and gas systems.
Power, data and safety systems
Lab equipment such as freezers, incubators, centrifuges and analyzers needs reliable power, and many sites add backup power. Our Master Electrician-led crew installs panels, circuits and lighting. Our low voltage team installs data, alarms, access control and monitoring.
Our Director of Health & Safety, Ghilda Gaber, leads site safety, which is important when we work near operating labs.
Casework, finishes and cleaning
Lab benches, cabinets and floors must resist chemicals and be easy to clean. Seamless flooring, sealed joints, cleanable ceilings and durable counters are typical. Our carpenters and interior systems crews install casework and finishes to suit.
Plan for equipment moves, since heavy instruments need clear paths and floor capacity.
Planning notes
Regulatory and accreditation requirements vary with the type of lab. Confirm them early with your advisors. Long-lead items include fume hoods, casework and specialty equipment, so ordering early protects the schedule.