Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Sector guides

Fitness Studio and Gym Fit-Out

Gyms are loud, hot and wet. The fit-out must handle weight, noise, humidity and many people.

Fitness Studio and Gym Fit-Out

Floors and structure

Heavy weights and impact need suitable flooring and, on upper floors, a structural check. Rubber and sprung floors protect the slab and reduce noise. Ask the landlord about floor loads early.

Mirrors, wall protection and storage for equipment should be planned into the design.

Ceiling height matters for jumping, climbing and group classes. Check clearance below ducts, sprinklers and lights.

Mirrors, wall padding and equipment anchors all need solid backing, which our framing crew installs before drywall.

Ventilation and cooling

Many people exercising generate heat, moisture and carbon dioxide. Fresh air rates and cooling capacity are significant. Poor ventilation leads to complaints and odours.

Our mechanical crew sizes and installs HVAC and controls for the real occupant load.

Humid air can damage finishes. Controls that raise ventilation when the room is full keep the space fresher and save energy.

Fitness Studio and Gym Fit-OutPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Change rooms and plumbing

Showers, toilets, sinks, lockers and benches need space and plumbing capacity. Hot water demand peaks at certain times. Floor drains, waterproofing and slip-resistant finishes are important.

Our plumbers and interior systems crew build these rooms and coordinate with tile and fixtures.

Floor drains and waterproofing in showers deserve care, because leaks reach neighbouring units quickly.

Noise and neighbours

Music and impact noise travel through walls and floors. Sound-rated assemblies, floating floors and acoustic ceilings reduce complaints from neighbours and the landlord.

Sound control may be a lease condition.

Ask neighbouring tenants about their hours and sensitivities before you set your class schedule.

Power, security and technology

Treadmills and other equipment need circuits. Access control, cameras and member check-in systems are common. Our electrical and low voltage teams install power, lighting, sound and security together.

Include clear, durable signage for safety and wayfinding, along with an emergency plan staff can follow.

Questions we hear

Can I put a gym on an upper floor?

Possibly, but floor loading, noise and vibration need careful review.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.