Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Mechanical and plumbing

Hot Water Systems for Commercial Buildings

Hot water demand varies widely by business. A dental office, a salon and a restaurant need very different systems.

Hot Water Systems for Commercial Buildings

Understand the demand

Count fixtures and how they are used. Peak demand matters more than the daily average. A salon may use a lot in short bursts, while an office uses little.

Our plumbers help size systems from actual use patterns.

Dish machines, spas, laundry and treatment equipment often need water at a higher temperature, which may require a booster heater.

Storage tank systems

Storage heaters hold hot water ready for use and handle peaks well. They lose some heat when idle and take space. Gas and electric versions exist, and you should check what your building can support.

They are familiar to most maintenance people.

Hot Water Systems for Commercial BuildingsPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Tankless and high-efficiency units

On-demand heaters save space and avoid standby losses, but need adequate gas or power and good venting. They suit steady, moderate use, and several units may be needed for peaks.

Water quality can affect them, so scale control matters.

Be careful with warranties, which can depend on water quality and maintenance.

Recirculation and safety

In larger spaces, long pipe runs can leave users waiting for hot water. Recirculation loops fix this, but need pumps, insulation and balancing. Temperature must be controlled to prevent scalding and bacteria growth.

Mixing valves and proper settings are part of the design.

Coordinate the trades

Gas lines, venting, electrical supply and drains need planning with the heater choice. Because we do plumbing, gas, electrical and framing ourselves, the equipment room is laid out once and built correctly.

Insulate pipes and label the equipment. Both are inexpensive during construction and save time and energy for years.

Questions we hear

Is tankless always more efficient?

Not always. It depends on use patterns. We compare options for your actual demand.

How long do heaters last?

It varies with type, water quality and care. Ask for expected life when comparing.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.