Glossary

Transformer

A transformer is an electrical device that raises or lowers voltage so that power from the utility or the building feeder suits the equipment it serves.

Transformer

What it means

Many commercial buildings receive power at one voltage and use it at another. A transformer steps the voltage down for lighting and receptacles, or adjusts it for certain equipment. Dry-type transformers are common indoors.

Transformers have a capacity rating, and they give off heat, so they need ventilation and clear working space.

Why it matters

Adding a transformer affects the budget, space and schedule. Larger units can have long lead times, and they must be placed where they can be ventilated, accessed and supported. Noise can also be an issue near offices.

An undersized transformer limits how much equipment you can run.

TransformerPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

How HSM handles it

HSM includes transformer needs in the early electrical load review. If a unit is needed, our engineers size it and our Master Electrician-led crew handles the installation, wiring and testing. We flag lead times as soon as the equipment is identified.

We coordinate with the building's operators on shutdowns, since connecting a transformer often requires a planned outage. Because mechanical and electrical are both our own crews, we also check that the room has enough airflow to remove the heat the unit produces.

What to plan for

Ask the landlord about space for equipment and the rules for outages. These details affect where the transformer can go and when it can be energized.

If you rent, ask whether the building already has a transformer with spare capacity. Using existing capacity can save significant cost and time.