Based in Edmonton, building across Western Canada · Calls and email answered 24/7/365 1 800 716 8955 · contact@hsmcm.ca

Automotive

Tire Shop Construction

Tire shops live by the seasons. HSM builds shops that handle the spring and fall rush, with room for storage, efficient bays and strong customer flow.

Tire Shop Construction

Built for volume

In Alberta, tire changeovers produce sharp peaks of demand. Shops need many bays, fast turnarounds and plenty of room for vehicles waiting outside. Layout and drive aisles must work when the shop is at its busiest.

Storage is the other half. Tires take a lot of space, and many shops store customers' seasonal sets. Racking, heated storage and fire safety all matter.

Equipment and systems

Our electrical crew installs power for tire changers, balancers, alignment racks, lifts and compressors. Our mechanical crew installs heat, ventilation and compressed air piping, plus drainage in wash or inspection areas. Overhead heaters or in-floor heat help keep technicians comfortable in winter.

Good lighting is vital for inspection work, and our electrical team plans fixtures and outlets for bays and storage.

  • Compressed air distribution
  • Tire racking and storage
  • Heated bays
  • Waiting room and retail area
Tire Shop ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Retail and waiting areas

Many tire shops also sell tires and accessories. A tidy counter, display wall and waiting area improve sales. Our carpenters and millwork team build counters and displays, and our painters finish the space to match your brand.

Doors and traffic

Overhead doors open and close hundreds of times a week. Our door and hardware crew installs doors suited to this use and plans for winter drafts. Parking, queuing and safe movement around vehicles are worth detailed thought on any site.

Planning for the season

Timing is important. We aim to finish work outside peak months so your shop is ready for the rush. Plan early for equipment lead times and municipal approvals.

Small improvements make a big difference at peak. Extra outlets for air tools, better lighting at the wheel stations and a clear route for vehicles all speed up work. Our electrical and mechanical crews can add these upgrades in a short window, so you can renovate in the slower months and be ready before the first snowfall.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.