Pre-Construction

The decisions made before construction starts have the biggest effect on cost and schedule. Pre-construction is where HSM helps you make them well.

Pre-Construction

What pre-construction covers

Pre-construction is the planning phase between an idea and a building permit. It includes scope definition, early budgets, schedule planning, drawing review and procurement strategy. Done well, it removes questions that would otherwise show up on site as delays or change orders.

Because HSM self-performs electrical, mechanical, low voltage, interior systems, carpentry, painting and doors, much of the review is done by the people who will carry out the work. A Master Electrician can look at a panel schedule and tell you whether the load and the routing make sense. Our mechanical team can spot a clash between ductwork and structure before drawings are issued.

Typical pre-construction tasks

  • Site walks and existing condition checks
  • Budget ranges that tighten as design develops
  • Constructability and coordination review
  • Identifying long-lead equipment such as switchgear, rooftop units and glazing
  • Preliminary schedule with permit and inspection timing
  • Phasing plans for occupied buildings
  • Early talks with landlords and building managers
Pre-ConstructionPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Alberta considerations

Permits, building code requirements and utility connections can shape a project. We look at these early. Winter conditions also matter. Concrete work, roofing and exterior finishes behave differently in cold weather, and a schedule should reflect that.

A short example of how it pays off

Suppose a tenant plans a new kitchenette and meeting rooms in an older office. During pre-construction we check the plumbing stack location, the electrical panel and the air handling zones. We may find that moving the kitchenette ten metres avoids a long drain run and a new panel. That kind of finding costs nothing to act on in planning and a great deal after the slab is cut.

What to plan for

Pre-construction has a cost in time more than in money. Give us access to the space, to drawings and to your decision makers. A few weeks of focused planning often saves far longer on site.