RFI

An RFI, short for request for information, is a formal written question about the drawings, specifications or site conditions. It is how a project team gets a clear answer on record.

RFI

What it means

RFIs are raised when drawings conflict, a detail is missing, a product is unavailable, or a site condition differs from what was expected. The question goes to the designer or engineer, who responds in writing. The answer then becomes part of the project record.

A good RFI is specific. It names the drawing, the location and the proposed solution, so the designer can approve or correct it quickly.

Why it matters

Unanswered questions stall work. If a trade cannot proceed until an engineer replies, the schedule slips and crews wait. A high number of RFIs can also be a sign that the drawings were not well coordinated before construction began.

For clients, the written record protects everyone, because it shows what was decided, when and why.

RFIPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

How HSM handles it

HSM reduces RFIs by reviewing and coordinating drawings before construction, a step that catches conflicts between electrical, mechanical and architectural work early. When questions still come up, our in-house engineering team, led by our Director of Engineering, can often review and propose a solution the same day.

Because our electricians, mechanical crews and interior systems crews work under one project manager, many coordination questions are settled on site without a formal RFI. The ones that need a formal answer are logged, tracked and followed until closed.

You can ask us for the RFI log at any time during your project.

What to plan for

Ask us how quickly RFIs are being answered at each progress meeting. If your designer is slow to respond, we want to know early so the schedule can be protected.