Structured cabling is the standardized system of cables, outlets, patch panels and racks that carries data, voice and other signals through a building.

Structured Cabling

What it means

A typical system runs cable from a central telecom room to outlets at desks, meeting rooms, wireless access points, cameras and displays. Cable categories describe the speed they support, and fibre is used for longer runs and backbones.

Everything is tested, labelled and documented so that each outlet can be traced to a port.

Why it matters

Cabling is infrastructure that outlasts most equipment. If it is planned well, a business can change devices and layouts for years without rewiring. If it is skimped, every change brings cost and downtime.

It must also be planned alongside power and ceilings: cable pathways, separation from electrical wiring and plenum-rated materials all affect the design.

Structured CablingPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

How HSM handles it

HSM's low voltage group, led by Adam Mason, installs structured cabling, wireless access points and network rooms, along with security, audio-visual and other systems. Because we also install the electrical and ceiling work, pathways, outlets and equipment racks are laid out with the whole space in mind.

We test and label every run and provide the documentation, and as a turn-key provider we can supply computer networks as well. Planning cabling during design means you pay for the outlets you need, not for fixes later.

What to plan for

Think about where you will want devices in three to five years, not only today. Extra conduit and spare capacity cost little at the start and a great deal later.

Choose where you want your telecom room early. It needs power, cooling and secure access, and moving it later is costly.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.