Panelboard

A panelboard is the enclosure that receives power from a feeder and distributes it to individual circuits, each protected by a circuit breaker.

Panelboard

What it means

Panelboards hold the breakers that switch off a circuit when there is a fault or overload. Commercial panels are fed from a main distribution board and serve lighting, receptacles, mechanical equipment and other loads. A panel schedule lists what each breaker controls.

Panels vary by voltage and phase, and their size is matched to the load.

Why it matters

Panels are the control point of the electrical system. If one is full, undersized or poorly labelled, adding circuits becomes slow and costly. Accurate labelling also affects safety, since a worker must know what a breaker controls before working downstream.

Panel space is a common limit in older buildings.

PanelboardPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

How HSM handles it

HSM's electrical crew sizes, installs and labels panelboards as part of tenant fit-outs and renovations. We check available spare capacity before design is final, and we provide clear, printed panel schedules at handover.

Where an existing panel is full, we assess whether a sub-panel, a relocated feed or a new panel is the better option. Because our electricians are led by a Master Electrician, the work is checked by someone with deep experience in the trade.

Panel locations also have clearance requirements that must be built into the layout.

What to plan for

Request updated panel schedules after any electrical changes. Keep the paper copy in or near the panel and a digital copy with your facilities records.

Ask your landlord who owns and maintains the panels in your space. Ownership affects who can approve changes and who must be notified of shutdowns.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.