Change Orders and How to Limit Them

A change order is a written agreement to alter the scope, price or schedule. Some are unavoidable. Many can be prevented.

Change Orders and How to Limit Them

Why changes happen

The main causes are owner requests after design is set, conditions found during construction, errors or gaps in drawings, and code or authority requirements.

Understanding which type you face helps you decide who carries the cost.

Prevent the avoidable ones

Complete the design before pricing. Confirm finishes, equipment and tenant requirements early. Name one person on your side who can approve decisions quickly.

Tell the team about future needs, such as extra data drops or power for equipment, so the infrastructure is included from the start.

Change Orders and How to Limit ThemPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

Handle necessary ones well

Ask for each change to be priced and approved in writing before the work proceeds, with the schedule effect stated. Keep a running log so the total is visible at all times.

Where a change affects several trades, our single-team approach gives you one answer, not several competing quotes.

Watch the timing

A change made during design costs little. The same change made after drywall is up can cost a lot, because finished work must be opened and redone.

Review layouts closely before framing begins.

Hold a short decision meeting every week. List open questions, assign an owner and a due date to each, and record the answers. Most changes grow from questions left open too long.

  • Freeze the layout before framing starts.
  • Confirm equipment sizes before rough-in.
  • Approve finish samples early.
  • Log every change with cost and schedule effect.

Our approach to changes

We price changes using our own crews and material experience, so quotes come back quickly and are easy to compare against the original scope.

Because electrical, mechanical and interior work are managed by one team, a change in one area is checked against the others before it is priced. That avoids the surprise of a second, related change a week later.

Questions we hear

Can a contractor refuse a change?

Contractors can decline or require a price and time adjustment first, which is why written approval matters.

Do change orders always add cost?

Not always. Some reduce scope or cost. All should be agreed in writing before the work goes ahead.