Interior systems

Steel Stud Framing

Steel stud framing is the skeleton of most commercial interiors. It has to be straight, accurate and ready for the trades that follow, which is why HSM frames with its own crew.

Steel Stud Framing

Why steel studs

Light-gauge steel is the usual choice for non-loadbearing commercial walls. It is straight, does not shrink or warp, resists fire better than wood framing, and goes up quickly. It also suits the tight layouts of tenant improvements, where walls often tie into existing ceilings and structure.

Stud size and gauge depend on wall height, the finish on each side, and any deflection requirement at the top of the wall. Taller walls, heavy wall-hung loads and rated assemblies all change the specification. Our in-house engineering team reviews these early so the framing is right the first time.

Layout and coordination

Good framing starts with accurate layout. Our crew marks the floor from the drawings, confirms dimensions against what is actually on site, and flags problems before the first track is fastened. In renovations, existing conditions rarely match old drawings, so this step saves real time.

Because our electricians and mechanical crews work for the same company, framing is planned around their needs. Openings for panels, conduit, ductwork and plumbing are located before the wall goes up. Blocking for millwork, grab bars, TVs, door frames and wall-mounted equipment is installed during framing, not guessed at later.

  • Layout from drawings, verified on site
  • Track, studs and deflection connections at the structure
  • Blocking for fixtures, equipment and hardware
  • Door and window frame rough openings
  • Inspection holds before the walls are closed
Steel Stud FramingPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
Where this work sits in an HSM project. Highlighted: the crew that does it, on our payroll.

What to plan for

The biggest risks are late design changes and unmarked existing conditions. Moving a wall after rough-in means rework in several trades. We recommend confirming room layouts, door locations and equipment before framing starts.

Walls that run to the underside of the structure need attention to fire and sound requirements, which may call for specific connections or sealants at the top. Tell us early if a wall has an acoustic or fire target.

Framing is also the first visible progress on a project, and a good moment for the client to walk the space and confirm that rooms feel the way they were drawn.

Start a project

Talk to us before you sign the lease.

One contract, our own electricians and mechanical crews, and a space that is ready on handover.