Fire Separation

Fire separation is the use of rated walls, floors, ceilings, doors and seals to contain fire and smoke to the area where it starts.

Fire Separation

What it means

A fire separation is described by its fire-resistance rating, usually measured in time. A rated wall is built from a tested assembly of studs, board, insulation and sealants, and every opening in it, such as doors, ducts and pipes, must be protected to match.

The code sets where separations are needed, such as between tenants, around exit corridors, shafts and certain rooms.

Why it matters

Fire separation protects people and property, and it is one of the main items inspectors check. A rated wall that is breached by an unsealed pipe is no longer a rated wall.

Tenant changes often cut into these assemblies. Adding a door, a duct or a cable run to a fire-rated wall requires the right detail.

Fire SeparationPHASE 1Site and leasePHASE 2Design and engineeringPHASE 3BuildPHASE 4OperateBUILD: TRADES ON THE PROJECTElectricalMechanical / HVACPlumbingLow voltage / securityInterior systemsCarpentry / millworkPainting / finishesDoors / hardwareSELF-PERFORMED BY HSM CREWS ON THIS TYPE OF WORK
How HSM delivers this work. Highlighted trades are self-performed by our own crews.

How HSM handles it

HSM builds rated assemblies with its own interior systems crew, following the tested details. Our electricians, mechanical crew and low voltage team coordinate penetrations with them, so every pipe, conduit and duct is sleeved and sealed at the time it is installed.

We also record what was done, with photos where useful, so inspection and later maintenance are straightforward. Our doors and hardware crew installs rated door assemblies and confirms that frames, closers and latching work as required.

What to plan for

Ask us to mark rated walls on your plans before you add equipment or cabling. Anyone working in the ceiling later should know which walls must be resealed after they pass through.

If your space has a mix of uses, such as storage next to public areas, ask us early how separation requirements will shape the plan.